1) 2) TOTAL MGR CIRCUIT IS DIVIDED IN 3 CONTROL STATIONS. MOVEMENT OF RAKE/LOCOMOTIVE , FROM ONE STATION TO ANOTHER , AFTER GETTING LINE CLEARANCE THROUGH PRIVATE NUMBER EXCHANGE & RECEIVING SLOT. ALL MOVEMENTS DONE WITH SIGNALS ONLY WHEREEVER PROVIDED. STATION WORKING RULE FRAMMED & DISPALYED AT ALL CONTROL STATIONS. ABSOLUTE BLOCK WORKING FOLLOWED DURING RAILWAY MOVEMENT THROUGH DUDHICHUA CIRCUIT ,WHERE ONLY ONE PARTY OPERATES AT A TIME
3)
4)
5)
3)
4) 5) 6)
STRICT ADHERENCE OF STAION WORKING RULE & MOVEMENT THROUGH SIGNALS . REGULAR BRAKE POWER TESTING OF RUNNING RAKES , AT LEAST ONCE IN A WEEK. SIGNAL OVERSHOOT PROTECTION SYSTEM PERIODICALLY TESTED. MONTHLY SAFETY AUDIT THROUGH VSTPP SFAETY TEAM & TECHICAL AUDIT THROUGH CORPORATE CENTRE TEAM. YEARLY SAFETY AUDIT IS PLANNED THROUGH RAILWAY EXPERTS. REGULAR FOOT PLATE INSPECTION BY DEPARTMENTAL HEAD & OTHER SENIOR OFFICIALS
3)
4)
5)
Operating Rake Size of 50 wagons (Highest among NTPC Projects ) with Guard Van as Last Vehicle. Confirmation of Last Vehicle at each control stations. Checking Brake Pressure at the last vehicle during every Tripp checking on Empty run at MGR Control Room. The outer Signal of any Control station (despatching end) is interlocked with SLOT , to be received from the Control station in advance (sending end) All Control station are Provided with Hot Line Telephone, in addition to NTPC Telephone & Wireless Communication.
DETAILS WDM2A Number of Locos 2 HP 2400 Max Speed(KMPH) 120 HSD Tank Cap(Lts) 5100 Weight 120 MT
LOCO MAINTENANCE
Light Schedule: T1,T2,M1,M2 including trouble shooting in MGR Work Shop. Heavy Schedule: M4 &M6 including Breakdown Maintenance in MGR Work Shop. Major Schedule: M 24 & M 48 in Railway Diesel Shed( like Patratu E.C.Rly) POH:M 96 at Railway Workshops Golden Rock(Trichy)
V-001
V-002
M-96(POH)
M-96(POH)
93,34,741
89,02,220
CRITICAL ISSUES
LIMITED SPACE FOR MGR WORKSHOP- NOTE SHEET MOVED IN 2002 BUT TURNED DOWN.AGAIN MOVED IN 2006, NOW WITH ENGG.
CRITICAL ISSUES
TWO NOS LOCO REQUIRED IN ADDITION TO 9 LOCOS AT PRESENT.ONE LOCO ARRANGED ON TEMPRORY BASIS FROM NTPC SIPAT.
52 Kg rail, short welded rail panel, T-12 rails for main line and T-18 for yard lines in use.
& spreading of ballast 6000 M3 for MGR track to make up ballast deficiency 2.Replacement of bridge timber 300 Nos on all the 4 nos of steel girder bridges with steel channel sleepers. 3. Replacement of worn out rails/crossings 100 Nos 4. Replacement of worn out wooden sleepers of Points & Crossings 102 Nos
500 Mtr Signalling cable laying between MGR relay room & location near point 11 Introduction of signal overshoot protection system in MGR circuit. New signal no.26 installed with necessary cable laying and circuitry modifications & commissioned at NGH cabin area to improve safety in train operation.
Installation of SOPS system on new locos and incorporating interlocking circuits with new DCH Line signals.