Project: One time job That has a define starting and end date ,a clearly specified objective or scope of works to be performed ,a predefined budget and usually a temporary organization that is dismantled once the project complete . Project Management : Project management is a process, the body of Knowledge of specific skills, tools and techniques that is used to bring structure and planned order to deliver project successfully.
Project GO Decision
ETEL P MOC T NE C RE P
STAGE I
STAGE II
STAGE III
STAGE IV
STAGE V
IMPLEMENTAT ION
Manufacturing Delivery Civil works Installations Testing
HANDOVER
Final testing, commissioning
3 3 5 5 5 5 5 5 5 5
5 5 5 5 5 5 5 5 5 5 5 5 5
Project Identification Site Clearance by MOEF Commitment for Land - State Govt. Commitment for Water - State Govt. Commitment for Coal - Central Govt. Railway clearance for fuel transportation
Sl. No.
Topographical Survey Geo-Technical Investigation Socio-Economic Survey Hydrological Survey Seismic Study FR Submission to CEA NOC from AAI NOC from SPCB
to to to to to
to -15 to -15
ERECTION
Land Allotment & infrastructure services Study of contract Document Equipment supply and receipt Monitoring of Equipment Dispatch ,Transportation Erection planning Work front release Monitoring Labor Law and Safety Erection Supervision Help in Commissioning & Documentation Release Payment Closing of Contract
Land Allotment & infrastructure services Area of Site office requirement Area for equipment storage & fabrication pre assembly Yard Construction water and power requirement Area for residential requirement of Agency
Equipment supply and Storage Authoring the release of equipment to erection contractor Storage plan Receipt of Material Inspection of material Issue MRC
Monitoring of Equipment Dispatch ,Transportation Ensure availability of equipment at site before Starting of erection Dispatch schedule and status by CMG Monitoring of equipment for any transportation delay Ensure Priority of Material
Erection Supervision Inspection of works FQP Control Measurement of works Taking over of equipment
Help in Commissioning & Documentation Release of equipment for Commissioning Issue SRCC Ensure All documents available for commissioning Release erection Checks for Commissioning Help for commissioning group
Release Payment
Entering Measurement in MB Certify for payment Budget monitoring Helped in Budget making Ensure for timely payment
Closing of Contract Completion report Make protocol Issue completion certificate Making deviation Statement Extra items rate analysis Time extension or LD Release security deposit
FESIBILITY REPORT
Introduction Demand analysis justification Feasibility Studies Layout system Civil works Mechanical system Electrical System
FESIBILITY REPORT
C&I System Environmental Aspects Technical data & BOQ Cost estimate & financial Analysis Profit Implementation Manpower Training Operation and Maintenance Philosophy Marketing Philosophy
FESIBILITY REPORT
List of approval Land from state and central Water from state and central MOEF NOC from AAOI Ministry of Coal Cal linkage PPA MOPC Railway
BUSBAR SCHEME
Single busbar Double buabar with one Bkr per circuit Double buabar with one Bkr per circuit Main and transfer Bus Ring Bus One and half Bkr arrangement Mesh Arrangement
Equipment used
Circuit Breaker Isolators Bus bar Galvanized steel structure CT CVT Compensation equipment CT LA and Wave trap CONTROL ROOM EQUIPMENT
Other system
Earthing Control room Illumination Protection system Cabling PLCC Fire fighting Communication Road and drain, antibiding, metal spreading & trench
Erection in switch
Site leveling Coordinate marking Earthing Mat Foundation & Road and drain Structure Equipment erection Earthing Cabling Testing Commessioning Charging
EARTHING SYSTEM
1-Average soil resistively 2-The selection of size of conductor 3-Fault level current 4-minimum rate of corrosion of material which is used for Life span of the grounding grid 40yrs 5-The total ground grid resistance is designed to carry out to sustain the fault current for a total life span of 40yrs
PARAMETERS REQ: 1-The size of ground conductor should be 40mm 2-Grid spacing to be maintained as 6mtrs 3-The depth of conductor 600mm under the ground. 4-The ground resistance should not be more than 0.5 ohms
Protection System
Bus Bar Differential Protection Tee Differential Protection LBB Protection Over Current / Earth Fault Protection Distance Protection
(Generator, GT and UT Protections are included in the GRP System)
CB
CB
Generator
Generator Bay
Line-1 Bay
Transfer Bay
CB
CB
Generator
Generator-1 Bay
Generator-2 Bay
Line-1 Bay
Line-2 Bay
Distance Protection
Zone-1 Reach (80 % of Line Length) Zone-2 Reach (80 to 120%) Zone-3 Reach (120 to 200 %) Reverse Reach (Up to Generator) Power Swing Blocking Auto Re-closing Scheme
Testing of Equipments
Circuit Breaker
Availability of documents Alignment & erection procedure as per specification gas pressure and Oil level , Earthing Pressure drop during operation Breaker operating time Contact resistance Trip coil & closing coil IR Value Operating system Operation check Relay and contractor check
Isolator
Availability of documents Alignment & erection procedure as per specification Earthing Motor checking IR Value Operating time Contact resistance Earth switch Local operation
Current Transformer
Availability of documents Alignment & erection procedure as per specification Polarity check IR value Ratio test Magnetizing current Tan delta & capacitance BDV of oil